Skip to content

Audit readiness check

How audit-ready are you? 10 questions, 2 minutes.

Ten statements, three answers: yes, partly, no. At the end you see your strong and weak areas and the DAMS modules that match the weak ones. Your answers are not stored or sent anywhere.

0 / 10 answered
  1. 01DocumentsOnly the current revision of work instructions is used on the floor, and we can prove it to the auditor.
  2. 02DocumentsFor every document, the approval workflow, revision history and reason for change can be seen in one place.
  3. 03CAPAThere are no overdue open CAPAs, and the effectiveness check of closed ones is on record.
  4. 048DWhen a customer asks for an 8D, we can prepare the report without collecting data from different files.
  5. 05CalibrationThe calibration dates and certificates of all measuring equipment can be seen in one place, and the person responsible is reminded of upcoming dates.
  6. 06CompetenceFor critical operations we know who is qualified at which level and where the training gaps are.
  7. 07PPEPPE issue and replacement dates are recorded per person; overdue replacements show up automatically.
  8. 08SDSCurrent safety data sheets for the chemicals in use can be reached from the shop floor.
  9. 09Environment and energyWaste quantities and meter readings can be compared period by period; we don't collect files to build a report.
  10. 10SatisfactionCustomer satisfaction and supplier evaluation results are in one report, and low scores trigger an action.

Cookie preferences

Choose which cookies you allow. You can change your choice here at any time.

EssentialSession and form security (CSRF). The site does not work without them.
Always on